Lobotomy Corporation implements a comprehensive containment and management system for Abnormalities. Abnormalities are classified by risk level. Employees are assigned specific work types (Instinct, Insight, Attachment, Repression) to manage them. A department system is established with Sephirot overseeing each department.
| 字段 | 内容 |
|---|
| 事件 ID | EVT-0003 |
| 确认状态 | confirmed |
| 剧透级别 | mild |
| 时间位置 | Lobotomy Corporation |
| 相关作品 | — |
| 参与者 | Manager, Sephirot, Employees |
| 组织 | Lobotomy Corporation |
| 地点 | L Corp Facility, Departments |
| 来源 | SRC-0001, SRC-0004 |
- Need to safely contain and manage Abnormalities for Enkephalin production.
- Abnormalities are classified into risk levels (ZAYIN to ALEPH).
- Employees are trained and assigned work types.
- Departments are established, each led by a Sephirah.
- Routine work cycles and management protocols are implemented.
- Operational framework for Enkephalin production is established.
- Employee safety protocols and monitoring systems are put in place.
- The containment system becomes the core operational loop of Lobotomy Corporation.
- The Sephirah/Department structure is integral to the Seed of Light project.